PO Box 22273
Lexington, KY
40522
ecogro012026.gif
E-mail: Info@EcoGro.net
ecogro012024.gif ecogro012022.gif ecogro012021.gif ecogro012020.gif ecogro012019.gif ecogro012017.gif
Stream Restoration
Stream & Pond
Bank Stabilization 
Ecological
Stewardship
Steep Slope
Stabilization 
Seeding
EcoGro Home
Erosion Prevention
& Sediment Control
ecogro012016.gif ecogro012015.gif
Advanced Mulcing
Technologies, Inc.
Contact Us 
Project Profiles
Office: (859) 231-0500
Fax: (866) 348-0528

The Mall at Lexington Green had been suffering from erosion along its pond banks for several years. The numerous geese that were attracted to the pond had eaten away most of the turf grass and were leaving a mess with their droppings. The result was a case of very poor water quality. Because there were no plants, there was no buffer to filter out sediment and pollutants from the water. Without plants, the excessive nitrogen was freely available for algae to grow without rampant. The facility management staff was using AquaShade at nearly 10-day intervals to keep the algae under control. In just a few weeks after our installation, the application was reduced by half.

        Now the landscape is using up more nitrogen and goose droppings before it gets to the algae in the water. The lush vegetation filtered trash, pollutants and debris from fouling the water. The decorative Kentucky native plants along the banks re-established a natural balance for the Nitrogen cycle. The dense root systems held together the soil in the banks. This is a prime example of restoring a balance for sediment control, nutrient management and water quality. The Lexington Green bank stabilization project shows that EcoGro can offer much more than what meets the eye.